Proceedings of the 3rd International Conference on Current and Future Trends in Bridge Design, Construction and Maintenance
Emerald Publishing Limited
ISBN print:
978-0-7277-4201-8
Publication date:
2011
Book Chapter
STUDY AND PRACTICE ON CABLE REPLACEMENT AND ADJUSTMENT OF CABLE STAYED BRIDGE
Xiao Wen,
Li Guxuan
Guangdong Provincial Changda Highway Engineering Ltd., Company Guangzhou, China
-
Published:2011
Citation
Xiao Wen, Li Guxuan, 2011. "STUDY AND PRACTICE ON CABLE REPLACEMENT AND ADJUSTMENT OF CABLE STAYED BRIDGE", Proceedings of the 3rd International Conference on Current and Future Trends in Bridge Design, Construction and Maintenance, B.I.G.Barr, Lin Shaopei, Dan M. Frangopol, Liu Xila, R. J. Lark, Mao Renjie, Andrzej S. Nowak, Huang Zhen
Download citation file:
Open figure viewer
1. Introduction
2. The Test and Inspection on Bridge before Cable Replacement
3. The New Cable Design
4. Workmanship of the Cable Replacement
5. Cable Adjustment
6. Conclusion
You do not currently have access to this chapter.