In 1998 Vattenfall decided to introduce the use of risk analysis in dam safety in Sweden, by issuing two pilot studies on the Seitevare and Ajaure embankment dams. The objective of these studies was to demonstrate methods to be applied for risk analysis on dams. SwedPower performed the Ajaure study in collaboration with BC Hydro International. Incorporated into this assignment were also a number of technical investigations in order to improve the knowledge base of the dam.

  • Background

  • Application of FMEA and Fmeca on Ajaure Facility

  • Conclusions and Lessons Learned

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.