The introduction of the “An engineering guide to seismic risk to dams in the UK” in 1991 has led Inspecting Engineers to pay greater attention to the seismic risk of the dams they inspect. For owners of large stocks of dams, such as United Utilities (UU), this has resulted in the need to investigate a large proportion of their dams. In order to proceed in a structured way, UU commissioned a Panel of Experts to advise on a methodology to investigate and analyse their embankment dams and to establish the need for detailed investigation and/or remedial works.

  • Introduction

  • Deterministic Approach

  • Probabilistic Approach

  • Acceptability Criteria

  • Proposed Methodology for Probabilistic Slope Stability Analyses

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.