• Background

  • The Problem

  • The Concept

  • Preliminary Design

  • Final Design

  • Float-Out (Figure 4)

  • Initial Placing (Figures 5 & 6)

  • Load Transfer to Drilled Shafts

  • Dewatering the Ventilation Buildings (Figure 7)

  • Construction of the Basement (Figures 8 & 9)

  • Construction Sequence

  • Placing Sequence

  • Schedule Saving

  • Conclusion

  • Acknowledgements

You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.