The use of base-grouted bored piles in Bangkok subsoils to solve soil the disturbance at pile toe and to improve end bearing capacity of bored piles has been increasing. This paper reviews the method of constructing base-grouted bored piles. The comparison of the performance between the base-grouted and non-grouted bored piles with respect to load capacity and settlement for varioussoil conditions is discussed. The method of using base-grouted and bored piles for the Bangkok subsoil conditions to meet the optimum requirements and safety is discussed.

  • INTRODUCTION

  • CONSTRUCTION METHOD AND PROBLEMS OF BORED PILES IN THE BANGKOK AREA

  • SETTLEMENT OF WET PROCESS BORED PILE WITHOUT GROUTED BASE

  • CONSTRUCTION METHOD OF BASE-GROUTED BORED PILE

  • COMPARISON OF BASE-GROUTED AND NON GROUTED BORED PILE PERFORMANCE

  • CONCLUSIONS

  • REFERENCES

This content is only available via PDF.
You do not currently have access to this chapter.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.