The success of business process re‐engineering (BPR) is dependent on the use of data‐driven methods that provide cost‐effective and optimal solutions. Today's business managers are inundated with methodologies and tools that claim to provide sustaining process improvement results. Determining the appropriate BPR method(s) to employ is a daunting task for many businesses. Understanding the technical complexities of these methods is even more overwhelming. However, with the increased availability of management science software, business managers can easily identify and employ proven management science techniques. Readily available software that provides timely results, is easily adaptable to resource changes, and does not require extensive technical competencies. This paper demonstrates how scientific management techniques, coupled with management science software (Management Scientist, Project Management and Excel), provided a feasible and achievable solution to a laboratory courier service BPR project. The solution yields a 19.5 percent reduction in annual laboratory courier specimen costs while improving service levels.
Article navigation
1 August 2004
Editors
Elena-Madalina Vatamanescu
Elena-Madalina Vatamanescu
Search for other works by this author on:
Research Article|
August 01 2004
Re‐engineering proves effective for reducing courier costs
Lee Revere
Lee Revere
School of Business and Public Administration, University of Houston‐Clear Lake, Houston, Texas, USA
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1758-4116
Print ISSN: 1463-7154
© Emerald Group Publishing Limited
2004
Business Process Management Journal (2004) 10 (4): 400–414.
Citation
Revere L (2004), "Re‐engineering proves effective for reducing courier costs". Business Process Management Journal, Vol. 10 No. 4 pp. 400–414, doi: https://doi.org/10.1108/14637150410548074
Download citation file:
New and popular articles
Suggested Reading
Investigating the impact of business‐process‐competent information systems (ISs) on business performance
Managing Service Quality: An International Journal (July,2006)
Going from six sigma to design for six sigma: an exploratory study using analytic hierarchy process
The TQM Magazine (October,2003)
Best practices in e‐business process management: Extending a re‐engineering framework
Business Process Management Journal (February,2004)
A strategy driven business process modelling approach
Business Process Management Journal (December,2005)
A global investigation of key turning points in business process maturity
Business Process Management Journal (September,2009)
Related Chapters
The Best-Laid Plans of Mice and Men often go Awry: The Disadvantages of Project Management
Project Management in the Library Workplace
Challenges for Globalised Information Systems in a Multilingual and Multicultural Context
Library and Information Science Trends and Research: Europe
e-HRM Systems in Support of “Smart” Workforce Management: An Exploratory Case Study of System Success
Electronic HRM in the Smart Era
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
