Unresolved construction dispute can be detrimental to project success. A systematic method to evaluate the seriousness of construction dispute of a construction project will assist management to take appropriate corrective actions. Evaluation of construction disputes requires an analysis on both the likelihood of occurrence and its impact, which are normally expressed by practitioners in linguistic terms. The application of classical discrete analysis will not be able to accommodate the fuzzy nature of this information. To determine how fuzzy sets theory can be applied to construction disputes evaluation (CDE), a fuzzy CDE model has been developed based on the knowledge extracted from practitioners in Hong Kong. The fuzzy CDE system consists of four components: dispute identification, dispute analysis; dispute evaluation; and dispute control. This paper describes the framework and operation of the fuzzy CDE system developed. The results indicate that CDE can be modelled by the fuzzy sets theory.
Article navigation
1 June 2001
Case Report|
June 01 2001
A fuzzy sets model for construction dispute evaluation Available to Purchase
Sai‐On Cheung;
Sai‐On Cheung
Department of Building and Construction, City University of Hong Kong, Hong Kong
Search for other works by this author on:
S. Thomas Ng;
S. Thomas Ng
Department of Civil Engineering, University of Hong Kong, Hong Kong
Search for other works by this author on:
Ka‐Chi Lam;
Ka‐Chi Lam
Department of Building and Construction, City University of Hong Kong, Hong Kong
Search for other works by this author on:
Wing‐Sang Sin
Wing‐Sang Sin
Department of Building and Construction, City University of Hong Kong, Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1477-0857
Print ISSN: 1471-4175
© MCB UP Limited
2001
Construction Innovation: Information Process Management (2001) 1 (2): 117–127.
Citation
Cheung S, Ng ST, Lam K, Sin W (2001), "A fuzzy sets model for construction dispute evaluation". Construction Innovation: Information Process Management, Vol. 1 No. 2 pp. 117–127, doi: https://doi.org/10.1108/14714170110814550
Download citation file:
Suggested Reading
Assessing the Value of Your Training: The Evaluation Process from Training Needs to the Report to the Board
Leadership & Organization Development Journal (August,2003)
A problemsolving approach to neighbourhood policing — the Camden model
Safer Communities (April,2010)
FMEA: Quality Assurance Methodology
Industrial Management & Data Systems (July,1990)
Economic comparison of pulsed electrostatic precipitators and fabric filters in coal‐fired utility plants
Environmental Management and Health (May,1999)
The ERIC database: a comparison of four versions
Reference Services Review (June,2003)
Related Chapters
Development of Ideas and Concepts
Specialised Tourism Products: Development, Management and Practice
Chapter 6 Diversity-Aware Search: New Possibilities and Challenges for Web Search
Web Search Engine Research
Experiencing Business Start-Up through an Enterprise Placement Year
Entrepreneurship Education: New Perspectives on Entrepreneurship Education
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.