A model of the information and material activities that comprise the overall construction process is presented, using the structured analysis and design technique (SADT) activity modelling methodology. The basic model is refined into a number of generic information handling activities such as the creation of new information, information search and retrieval, information distribution and person‐to‐person communication. The viewpoint could be described as that of information logistics. The model is then combined with a more traditional building process model, consisting of key phases such as design and construction. The resulting two‐dimensional matrix can be used for positioning different types of generic IT‐tools or construction‐specific applications. The model can thus provide a starting point for a discussion of the application of information and communication technology in construction and for measuring its impact on the overall process and its related cost.
Skip Nav Destination
Article navigation
1 September 2002
Research Article|
September 01 2002
A formalised model of the information and materials handling activities in the construction process Available to Purchase
Bo‐Christer Björk
Bo‐Christer Björk
Swedish School of Economics and Business Administration, Helsinki, Finland
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1477-0857
Print ISSN: 1471-4175
© MCB UP Limited
2002
Construction Innovation: Information Process Management (2002) 2 (3): 133–149.
Citation
Björk B (2002), "A formalised model of the information and materials handling activities in the construction process". Construction Innovation: Information Process Management, Vol. 2 No. 3 pp. 133–149, doi: https://doi.org/10.1108/14714170210814739
Download citation file:
Suggested Reading
Resolving knowledge discrepancies in situation‐aware systems
International Journal of Pervasive Computing and Communications (November,2005)
Information logistics for continuous dependability improvement
Journal of Quality in Maintenance Engineering (August,2014)
Apparatus for centrifuge modelling of top down basement construction with heave reducing piles
International Journal of Physical Modelling in Geotechnics (March,2009)
Precontractual investigation and risk aversion
Engineering, Construction and Architectural Management (February,1994)
Developing management policies and analyzing impact of change orders on labor productivity in construction projects
Journal of Engineering, Design and Technology (March,2021)
Related Chapters
TBM View—Real-Time Continuous TBM Parameters Trend Monitoring
Crossrail Project: Infrastructure design and construction
Introduction
Bridge Construction Equipment
Introduction
Delay and Distruption Claims in Construction: A practical approach
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
