Design and build (D/B) construction methods have gained more importance in recent years for their potential advantages in improving project performance. There are, however, a number of problems that are commonplace in D/B procurement, which, when they interact with each other, can lead to project time and cost overrun problems. The most important among them are design changes, together with communication and coordination lapses among concerned parties. Past research has focused only on the characteristics of the traditional construction, or separate sub‐systems such as different phases or human resource input to projects. An attempt is made in this paper to improve D/B project time and cost performance. A generic system dynamics model is developed that incorporates major sub‐systems and their relationships inherent in D/B constructions projects. It is validated and calibrated for a typical large D/B infrastructure project using time and cost overrun problems experienced in Thailand. Extensive simulations with many policies, individually or in various combinations, show that improvement in time or cost can be made with proper policy combinations that reflect strong interactions between the whole design and build system and can be derived only if these interactions are accounted for. To achieve overall improvement in both time and cost, the combination of full overtime schedule, average material ordering, and fast track construction with moderate crashing of design is most appropriate. If cost is the focus, extending the construction schedule, combined with material ordering based on actual need, and design and build with traditional construction method is the best solution.
Article navigation
1 December 2002
Research Article|
December 01 2002
System dynamics modeling of design and build construction projects Available to Purchase
S. Chritamara;
S. Chritamara
Graduate School of Engineering Management, South‐East Asia University, Bangkok, Thailand
Search for other works by this author on:
S.O. Ogunlana;
S.O. Ogunlana
School of Civil Engineering, Asian Institute of Technology, Bangkok, Thailand
Search for other works by this author on:
N.L. Bach
N.L. Bach
School of Advanced Technologies, Asian Institute of Technology, Bangkok, Thailand
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1477-0857
Print ISSN: 1471-4175
© MCB UP Limited
2002
Construction Innovation: Information Process Management (2002) 2 (4): 269–295.
Citation
Chritamara S, Ogunlana S, Bach N (2002), "System dynamics modeling of design and build construction projects". Construction Innovation: Information Process Management, Vol. 2 No. 4 pp. 269–295, doi: https://doi.org/10.1108/14714170210814801
Download citation file:
Suggested Reading
Investigating the effect of initial scope establishment on the performance of a project through system dynamics modelling
Engineering, Construction and Architectural Management (May,2001)
Modeling and simulating the dynamics in project monitoring and earned value analysis
Journal of Advances in Management Research (January,2006)
The aerodynamic study on the mutual impact of the wings in the tandem wing configuration
Aircraft Engineering and Aerospace Technology: An International Journal (March,2025)
A study on the influence of ground static pitch angle on ground-roll instability
Aircraft Engineering and Aerospace Technology: An International Journal (January,2026)
Augmenting the space domain awareness ground architecture via decision analysis and multi-objective optimization
Journal of Defense Analytics and Logistics (June,2021)
Related Chapters
Analysing Smart Tourism Ecosystems for Sustainable Development: A System Dynamics Approach
Shaping Collaborative Ecosystems for Tomorrow
Chapter 4 Tourism transport, technology, and carbon dioxide emissions
Tourism and the Implications of Climate Change: Issues and Actions
Feasibility Study Methods for Entrepreneurs in Sustainability-related Ventures
Entrepreneurship, Institutional Framework and Support Mechanisms in the EU
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.