Purpose

Cost overruns are an inevitable issue in design and build (D&B) projects. In D&B projects, causes for cost overruns can be managed by adopting appropriate building information modelling (BIM) functions. Because there is a research gap in synergy between the use of BIM for mitigating cost overruns in D&B projects, this study aims to evaluate the adaptability of BIM to manage cost overrun issues in them.

Design/methodology/approach

Research objectives were attained through a quantitative research approach adopting the Delphi technique, which consists of three rounds of a questionnaire survey. Through statistical tools, the collected data were analysed.

Findings

This research revealed the ten most crucial causes for cost overruns in D&B projects, where continuous changes in designs and drawings are the top causes. Change and revision management and interoperability are the most crucial BIM functions to address the aforementioned cause. Subsequently, 16 enablers, 26 barriers and 19 strategies to implement BIM to manage the identified significant causes of cost overruns were overviewed.

Originality/value

This study addresses the literature gap pertaining to the cost overrun in D&B projects and the application of BIM by studying the causes for cost overrun, suggesting BIM functions to mitigate the above cause. Moreover, this study assessed the probable barriers and enablers for BIM adoption in construction projects from D&B perspective.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$39.00
Rental

or Create an Account

Close Modal
Close Modal