Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: 4D BIM
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
4D BIM integrated optimization of construction steel bar procurement plan for limited storage capacity
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2025) 25 (5): 1501–1521.
Published: 22 January 2024
... The proposed framework incorporates 4D BIM for optimizing rebar procurement plans. The flowchart of the proposed framework has been presented in Figure 1 . The suggested methodology will be discussed in the following sections. Figure 1. The proposed framework for optimal construction steel bar...
Journal Articles
Method for automating the processes of generating and using 4D BIM models integrated with location-based planning and Last Planner® System
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2024) 24 (4): 1005–1025.
Published: 23 January 2023
... Planning and the Last Planner® System is not well discussed. Therefore, this paper aims to develop a method for automating the generation and use of 4D BIM models integrated with Location-Based Planning and Last Planner® System supporting project control cycles. Design/methodology/approach The research...
Journal Articles
Development and validation of a framework for preventing and mitigating construction delay using 4D BIM platform in Bangladeshi construction sector
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2023) 23 (5): 1255–1278.
Published: 23 August 2022
... in the context of Bangladesh and other countries. Next, a 4D BIM-based framework was developed using Autodesk Navisworks Manage. Finally, it was used to run on-site simulations on an ongoing construction project which faced delays because of design errors and inefficient planning. Findings Affirmative...
Journal Articles
Enhanced model of the innovation-decision process, for modular-technological-process innovations in construction
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2022) 22 (4): 1085–1103.
Published: 10 September 2021
...-method study (n = 246) informed by a research philosophy of pragmatism, investigating the applicability of classic IDT to the adoption of four-dimensional (4D) building information modelling (4D BIM) by the UK construction sector. Findings This diffusion study resulted in the adaptation...
