Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Construction robotics
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Anthony Paul Franzè, Müge Belek Fialho Teixeira, Glenda Caldwell, Jacob Dawson, Gabriela Isabel Valdez Mena, Hamid Reza Rafizadeh, Tim Schork, Lloyd Gainey, Maja Caballero, Tatheer Zahra
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2025) 25 (7): 384–408.
Published: 21 November 2025
...) Bricklaying Augmented reality (AR) Cobot Construction robotics Architectural robotics Digitalisation Masonry construction Building 4.0 CRC, Brickworks and Queensland University of Technology (QUT). Building 4.0 CRC Project 85. Australia is facing a housing crisis; there are not enough...
Journal Articles
Thomas Linner, Wen Pan, Rongbo Hu, Charlie Zhao, Kepa Iturralde, Meysam Taghavi, Julian Trummer, Marcel Schlandt, Thomas Bock
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2020) 20 (1): 96–111.
Published: 16 October 2019
... construction robots (STCRs)], the purpose of this study is to equip development projects with a systematic design-management system model that allows to integrate the different needs and aims of stakeholders. Design/methodology/approach This paper proposes a STCR-technology management system (STCR-TMS...
