Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Issue Section
Date
Availability
1-5 of 5
Keywords: Regression analysis
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
System model for analysing construction labour productivity
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2016) 16 (2): 203–228.
Published: 04 April 2016
... from literature. Field data were collected from 11 projects over a span of 29 months. Activity models based on the relationship between CLP and WSPs were created, and their validity was tested using regression analysis for eight activities in the concreting, electrical and shutdown categories...
Journal Articles
Wearing comfort of two construction work uniforms
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2015) 15 (4): 473–492.
Published: 05 October 2015
... at: jackieyang8852@yahoo.com.hk © Emerald Group Publishing Limited 2015 Artificial neural network Fuzzy logic Regression analysis Clothing comfort Construction workers Hong Kong is situated in the subtropical South China coast in the East Asian monsoon region (22°18’N, 114°10’E), which...
Journal Articles
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2013) 13 (1)
Published: 11 January 2013
... between a subjective perception and the objective reality of labour productivity. Keywords Analytical hierarchy process, Labour, Productivity rate,Regression analysis www.emeraldinsight.com/10.1108/14714171111104655 This article originally appeared in Volume 11 Number 1, 2011, pp. 92-113...
Journal Articles
Labour productivity model for reinforced concrete construction projects
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2011) 11 (1): 92–113.
Published: 18 January 2011
... This research explores the differences between a subjective perception and the objective reality of labour productivity. Labour Productivity rate Regression analysis Analytical hierarchy process Productivity is an important aspect of the construction industry that may be used as an index...
Journal Articles
Comparison of neural network and binary logistic regression methods in conceptual design of tall steel buildings
Available to Purchase
Journal:
Construction Innovation
Construction Innovation: Information Process Management (2007) 7 (3): 240–253.
Published: 17 July 2007
..., 1989) is as given below. Hassan Al Nageim can be contacted at: h.k.alnageim@ljmu.ac.uk © Emerald Group Publishing Limited 2007 Neural nets Binary logic Regression analysis Steel Buildings Design of tall steel buildings comprises of two distinct stages: conceptual and detailed...
