Open figure viewer
The new military specification for PCB base material was published on February 11th, 1987. This ‘G’ version is not merely an amendment of the ‘F’ version, but basically a new specification with far reaching consequences for both the base material manufacturers and the printed circuit board manufacturers. In this paper the major changes and also the latest introductions are discussed.
This content is only available via PDF.
© MCB UP Limited
1988
You do not currently have access to this content.
