This paper considers the impact that contractual procedures have upon the client's control system's ability to deal with unexpected problems. An analysis is made of the relevant procedures set out in the New Engineering Contract (NEC) and a comparison is made to those set out in the Standard Form of Building Contract 1980 Edition (JCT 80). The comparative analysis is based upon a model of problem solving which identifies four critical stages in the problem solving process. The objective of the paper is to identify the strengths and weaknesses of JCT 80 and NEC in relation to the stages of this model. The aim of the paper is to make some recommendations which could be incorporated into future contracts to improve problem solving effectiveness. This work is a continuation of a research project which is considering the communication and behavioural aspects of the problem solving process in construction projects.
Article navigation
1 February 1994
Review Article|
February 01 1994
Dealing with unexpected problems — do contracts help? A comparison of the NEC and JCT 80 forms
MARTIN LOOSEMORE
MARTIN LOOSEMORE
Centre for Research in the Built Environment, University of Glamorgan, Pontypridd, Mid Glamorgan, CF37 1DL, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
1994
Engineering, Construction and Architectural Management (1994) 1 (2): 115–137.
Citation
LOOSEMORE M (1994), "Dealing with unexpected problems — do contracts help? A comparison of the NEC and JCT 80 forms". Engineering, Construction and Architectural Management, Vol. 1 No. 2 pp. 115–137, doi: https://doi.org/10.1108/eb020996
Download citation file:
New and popular articles
Suggested Reading
Possible lessons from a recent technology (Nuclear) for an emerging (Ubiquitous Embedded Systems) technology
Journal of Information, Communication and Ethics in Society (November,2004)
Contractual control, the propensity to trust, active trust development: construction industry
Journal of Business & Industrial Marketing (May,2016)
DISCUSSION. CONSIDERATIONS IN CONNEXION WITH INVITING AND PREPARING TENDERS. WORKS CONSTRUCTION DIVISION.
The Institution of Civil Engineers Engineering Division Papers (January,1946)
Accounting outsourcing practices in Malaysia
Journal of Asia Business Studies (January,2012)
The dynamics of commissioning across organisational and clinical boundaries
J Health Organ Manag (May,2008)
Related Chapters
Strategic Management Research in Emerging Economies: A Lens Model Perspective
West Meets East: Toward Methodological Exchange
Tough Times, Difficult Choices and Public Entrepreneurship: Is Sponsorship a Winning Solution?
New Perspectives on Research, Policy & Practice in Public Entrepreneurship
Banking and Fintech: A Challenge or Opportunity?
Contemporary Issues in Finance: Current Challenges from Across Europe
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
