Utilization of off‐highway vehicles forms an essential part of UK industry's efforts to augment the productivity of plant operations and reduce production costs. However, uninterrupted utilization of plant and equipment is requisite to reaping the maximum benefit of mechanization; one particular problem being plant breakdown duration and its impact upon process productivity. Predicting the duration of plant downtime would enable plant managers to develop suitable contingency plans to reduce the impact of downtime. This paper presents a stochastic mathematical modelling methodology (more specifically, probability density function of random numbers) which predicts the probable magnitude of ‘the next’ breakdown, in terms of duration for tracked hydraulic excavators. A random sample of 33 machines was obtained from opencast mining contractors, containing 1070 observations of machine breakdown duration. Utilization of the random numbers technique will engender improved maintenance practice by providing a practical methodology for planning, scheduling and controlling future plant resource requirements. The paper concludes with direction for future research which aims to: extend the model's application to cover other industrial settings and plant items; to predict the time at which breakdown will occur (vis‐à‐vis the duration of breakdown); and apply the random numbers modelling to individual machine compartments.
Article navigation
1 March 2001
Review Article|
March 01 2001
Modelling the magnitude of plant downtime: a tool for improving plant operations management
DAVID J. EDWARDS;
DAVID J. EDWARDS
The Plant Management Research Group, School of Engineering and the Built Environment, University of Wolverhampton, Wulfruna Street, Wolverhampton, West Midlands WV1 1SB, UK
Search for other works by this author on:
SILAS YISA
SILAS YISA
The Plant Management Research Group, School of Engineering and the Built Environment, University of Wolverhampton, Wulfruna Street, Wolverhampton, West Midlands WV1 1SB, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2001
Engineering, Construction and Architectural Management (2001) 8 (3): 225–232.
Citation
EDWARDS DJ, YISA S (2001), "Modelling the magnitude of plant downtime: a tool for improving plant operations management". Engineering, Construction and Architectural Management, Vol. 8 No. 3 pp. 225–232, doi: https://doi.org/10.1108/eb021184
Download citation file:
Suggested Reading
Adaptive quadtree subdividing contour plotting algorithms
Engineering Computations (June,1995)
Sub-pixel motion estimation using phase correlation: comparisons and evaluations
International Journal of Intelligent Computing and Cybernetics (November,2016)
Possibility‐Probability Transformation: A New Result via Information Theory of Deterministic Functions
Kybernetes (July,1994)
A simple method of determining moments of a top event
International Journal of Quality & Reliability Management (July,1996)
On the Axiomization of Conditional Independence
Kybernetes (July,1992)
Related Chapters
On the Size Distortion from Linearly Interpolating Low-frequency Series for Cointegration Tests
Essays in Honor of Peter C. B. Phillips
Exploring the Many-Worlds Theory through the Marvel Films Spider-Man Story Arc: Spider-Verse: FILM: Spider-Man: No Way Home (2021)
An Inquiry Based Approach for Using Comic Based Stories to Teach Liberal Arts and Social Sciences
Paradox? What Paradox? On a Brief Correspondence Between Leonard Savage and Karl Popper
Research in the History of Economic Thought and Methodology: Including a Symposium on Sir James Steuart: The Political Economy of Money and Trade
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
