The commissioning of building services is very much the ‘Cinderella’ activity in the construction cycle, many complaints are heard but few praises sung. This paper examines the current process of commissioning building services within the traditional procurement route. A literature review is presented followed by the results of a two‐stage structured survey from a broad spectrum of participants. A best practice flow chart for managing the commissioning process is presented, tested and confirmed, identifying an auditable chain of responsibilities in the commissioning process. Key conclusions include the need to recognize that the commissioning process requires planning and managing from the earliest possible stage; the need to appoint a commissioning manager — preferable someone in‐house, or a member of the design team; the need for better end‐user documentation and training; the requirement for a more formalized approach and the requirement for clarification on the terms of engagement for the services designer.
Article navigation
1 April 2002
Review Article|
April 01 2002
Managing the commissioning of building services
KEITH POTTS;
KEITH POTTS
Built Environment Research Unit, School of Engineering and the Built Environment, University of Wolverhampton, Wulfruna Street, Wolverhampton WV1 1SB, UK
Search for other works by this author on:
MIKE WALL
MIKE WALL
Tunnicliffe Wall Associates, Building Services Consulting Engineers, St. James House, 70 Hill Top, West Bromwich, West Midlands B70 OPU, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2002
Engineering, Construction and Architectural Management (2002) 9 (4): 336–344.
Citation
POTTS K, WALL M (2002), "Managing the commissioning of building services". Engineering, Construction and Architectural Management, Vol. 9 No. 4 pp. 336–344, doi: https://doi.org/10.1108/eb021228
Download citation file:
New and popular articles
Suggested Reading
Delivering value to building users through commissioning
Facilities (November,2001)
CIBSE awards third Happold Brilliant to University of Northumbria at Newcastle
Facilities (January,2001)
Modelling of owner‐occupiers' perception of small‐scale maintenance builders' performance – part II
Structural Survey (December,2004)
Prisoners train for the tool trade with Travis Perkins: Scheme makes business sense and brings social benefits
Human Resource Management International Digest (October,2010)
Buro Happold Large Building Services Consultancy of the Year 2000
Facilities (January,2001)
Related Chapters
Vehicle-borne threats and the principles of hostile vehicle mitigation
Blast Effects on Buildings
Designing for operational resilience
Blast Effects on Buildings
Thinking about Case Studies in 3-D: Researching the NHS Clinical Commissioning Landscape in England
Case Study Evaluation: Past, Present and Future Challenges
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.