International comparisons of contractor performance can provide robust benchmarks for contractors in different countries and help to identify ways towards performance improvement. Based on a hypothetical construction project, overall contractor performance (OCP) in Japan, the UK and the USA is compared. Overall contractor performance is defined to embrace construction cost, construction time, construction quality and sustainable development, the philosophy being that the achievement of one aspect of performance should not be at the expense of another. Multiple regression analysis reveals that overall contractor performance is dependent on: their past performance on previous similar projects; their commitment towards lifetime employment; their perceived importance of time performance; their relationship with subcontractors; and the number of design variations during construction. To improve their overall performance, contractors are advised to focus on construction time, reduce delays, maintain a stable workforce and establish partnerships with their subcontractors. Clients should attempt to reduce design variations during construction.
Article navigation
1 October 2003
Research Article|
October 01 2003
Factors influencing contractor performance: an international investigation
Hong Xiao;
Hong Xiao
Hong Xiao is a Researcher, Director of Research at the Built Environment Research Unit, School of Engineering and the Built Environment, University of Wolverhampton, Wolverhampton, UK.
Search for other works by this author on:
David Proverbs
David Proverbs
David Proverbs is Postgraduate Co‐ordinator, at the Built Environment Research Unit, School of Engineering and the Built Environment, University of Wolverhampton, Wolverhampton, UK.
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2003
Engineering, Construction and Architectural Management (2003) 10 (5): 322–332.
Citation
Xiao H, Proverbs D (2003), "Factors influencing contractor performance: an international investigation". Engineering, Construction and Architectural Management, Vol. 10 No. 5 pp. 322–332, doi: https://doi.org/10.1108/09699980310502937
Download citation file:
New and popular articles
Suggested Reading
Managing subcontractor supply chain for quality in construction
Engineering, Construction and Architectural Management (January,2006)
Bid or no-bid decision factors of indigenous contractors in Nigeria
Engineering, Construction and Architectural Management (May,2017)
Knowledge workers in the in‐between: network identities
Journal of Organizational Change Management (July,2007)
Soft landings: A fresh scope of service that ensures users and clients get the best out of a new building
Journal of Facilities Management (January,2006)
Applying rich picture diagrams to model case studies of construction projects
Engineering, Construction and Architectural Management (March,2007)
Related Chapters
Dismantling Managerial Values: When Law’s Ambiguity Meets Organizational Complexity
Legal Intermediation: A Processual Approach to Law and Economic Activity
Macroeconomic and Non-Macroeconomic Variables Linking to Singapore Hotel Stock Returns
Advances in Hospitality and Leisure
WATER-CEMENT RATIO LAW AND SILICA FUME CONCRETE MIX DESIGN
Cement Combinations for Durable Concrete: Proceedings of the International Conference held at the University of Dundee, Scotland, UK on 5–7 July 2005
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.