Article navigation

This paper presents the algorithm of construction work graphic schedule which considers the proper sequencing problem. Describes the algorithm step by step, i.e. the construction work organisation methods with zero couplings between realisation means, work fronts, and their combination. It also shows the calculation process of limit possible minimum by considering technical and organisation limits. In the second part of the paper, the practical example which shows the method and the optimisation algorithm for the work organisation method with zero couplings between realisation means is presented.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options