Purpose

The objective of this paper is to develop an efficient project management system to track and control construction activities for contractors and/or project managers.

Design/methodology/approach

The work package model is utilized to break down project data into activities and work tasks. The data structure of a project is represented using the entities‐relationship methodology. A relational database stores all of the project data. The earned value method calculates the cost and schedule variances. The internet‐based platform with three‐tier client‐server architecture is chosen for system implementation.

Findings

The developed project database stores all of the project data necessary to perform project control functions. The implementation of the project database management system is efficient. The developed system provides real‐time data sharing and a collaborating environment in support of project control.

Originality/value

Time and cost control are essential management functions for achieving successful delivery of engineering, procurement and construction (EPC) projects. The developed system can assist contractors and/or project managers in tracking and control of their construction projects in a real‐time manner.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal