Article navigation
Purpose

The purpose of this paper is to present a methodology to evaluate the capital investments in infrastructure projects managed by private operators considering uncertainties in the operation and maintenance of the infrastructure components.

Design/methodology/approach

The methodology described in this paper is based on two major sources of information: deterioration curves of the infrastructure systems obtained from Markov chain models and the value of flexibility obtained from a real options analysis.

Findings

Using this methodology, it is possible to determine whether there is value if project managers adopt flexible strategies in determining capital investments. These strategies refer to the opportunities of postponing, deferring or canceling capital investments required to maintain the operation of the infrastructure systems.

Research limitations/implications

The model utilizes Monte Carlo simulation and real options analysis to overcome the complexities associated with the solution of the differential equations that represent the variability of the main factors in the project cash flow.

Originality/value

The methodology presented in this paper can be used by public officials, private investors, and asset managers to determine the value of flexibility associated with the strategies required to maintain the operation of infrastructure assets.

You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options