Skip to Main Content
Article navigation

Design and build has increased in its use for construction procurement in recent times. However, its performance as a procurement method has been widely criticized by professionals in the construction industry. This paper reports a survey of 40 architects, using a structured questionnaire to investigate the performance of contractor‐led design and build in project procurement. Although 20% of architects' private sector workload (and 8% of public sector) is derived from D&B, they perceive this procurement type to involve sacrificing product quality and design innovation. Where clients insist on a choice of D&B, architects generally prefer the use of either novation D&B or develop and construct, rather than ‘traditional’ D&B.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal