Disputes under the New Engineering Contract (NEC) 2nd Edition involve a new approach to the role of Adjudicator. Clauses 90–93 have been radically revised. They reflect the recommendations of Latham's Report Constructing the Team, and growing international practice (e.g. the Channel Tunnel Disputes Panel). Also clarified are some questions over the 1 st Edition. The independent Adjudicator provides a mandatory third‐party neutral settlement process. The decision is final and binding, unless and until revised by the eventual tribunal (court or arbitration) after completion of the works, or termination. Legal drafting is achieved in the NEC style of plain English and present tense. Latham's objectives are reminiscent of traditional decisions of an independent Engineer, or of modern short form arbitration; but the new substantive approach is distinguished from both. The Adjudicator's decision determines the parties' rights and obligations. It does not depend on the Project Manager's implementation, but the latter is free to choose in accordance with the decision, e.g. by changing the Works Information as a compensation event. Distinctive of the NEC is the openness of procedure for the Adjudicator, and even‐handedness between the parties as to the continuing works while the Adjudicator is acting. The parties, by contract, given the independent Adjudicator jurisdiction to settle by its decision all disputes arising under or in connection with the contract. This is neither expert determination nor arbitration. The Adjudicator is to act fairly, not judicially. Some jurisdictional issues may remain, and are explored. There must be a proper substantive characterization of the new role, according to its true context and the parties' expressed intentions. NEC 2nd edition has clarified and enhanced the definition of the first third‐party stage fully to meet Latham's objectives, and to encourage by rapid but effective early resolution of disputes, within the overall NEC philosophy, a substantial reduction in the incidence of disputes.
Article navigation
1 April 1995
Review Article|
April 01 1995
The Adjudicator under NEC 2nd Edition: a new approach to disputes
PHILLIP N. CAPPER
PHILLIP N. CAPPER
Masons, 30 Aylesbury Street, London EC1R 0ER, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
1995
Engineering, Construction and Architectural Management (1995) 2 (4): 317–326.
Citation
CAPPER PN (1995), "The Adjudicator under NEC 2nd Edition: a new approach to disputes". Engineering, Construction and Architectural Management, Vol. 2 No. 4 pp. 317–326, doi: https://doi.org/10.1108/eb021018
Download citation file:
331
Views
Suggested Reading
Experiences of the use of the New Engineering Contract
Engineering, Construction and Architectural Management (April,1995)
Expert determination: a suitable dispute resolution technique for offshore construction project disputes? Part II
Journal of International Trade Law and Policy (January,2004)
Expert determination: a suitable dispute resolution technique for offshore construction project disputes? Part I
Journal of International Trade Law and Policy (January,2003)
Legal threats against the existence of famous brands a study on the dispute of the brand Pierre Cardin in Indonesia
International Journal of Law and Management (December,2020)
Pioneering the NEC system of documents
Engineering, Construction and Architectural Management (April,1995)
Related Chapters
Arbitration in Tourism The Industry Performance
Managing Destinations: From Theories to Practices
The final deciding of a Dispute
FIDIC 2017: A Definitive Guide to Claims and Disputes
The implementation of final awards on a Dispute
FIDIC 2017: A Definitive Guide to Claims and Disputes
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.