Purpose

Precast construction has become increasingly popular in the construction industry. Nonetheless, the logistics of construction materials has been a neglected topic, and this neglect has resulted in delays and cost overruns. Careful planning that considers all of the factors affecting construction logistics can ensure project success. The purpose of this paper is to examine the potential for using genetic algorithms (GAs) to derive logistics plans for materials production, supply and consumption.

Design/methodology/approach

The proposed GA model is based on the logistics of precast components from the supplier’s production yard, to the intermediate warehouse and then to the construction site. Using an activity-based costing (ABC) approach, the model not only considers the project schedule, but also takes into account the production and delivery schedule and storage of materials.

Findings

The results show that GAs are suitable for solving time-cost trade-off problems. The optimization process helps to identify the activity start time during construction and the delivery frequency that will result in the minimal cost. What-if scenarios can be introduced to examine the effects of changes in construction logistics on project outcomes.

Originality/value

This paper presents a method for using GAs and an ABC approach to support construction logistics planning decisions. It will help construction planners and materials suppliers to establish material consumption and delivery schedules, rather than relying on subjective judgment.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal