Purpose

Scheduling in information-driven design phase of construction projects is challenging due to multiple entity types (teams, components, deliverables, activities or parameters) and their dependencies/linkages. Established techniques such as dependency structure matrix (DSM), beeline diagramming method (BDM), multiple domain matrix (MDM), etc. have been independently utilized in past to model information dependencies/linkages and associated iteration. However, there has not been a holistic solution yet for scheduling multiple entity types and their relationships. Hence, an integrated solution needs to be developed that schedules information-driven projects accurately.

Design/methodology/approach

A case study data collection approach is utilized. With data from two projects, i.e. hostel design and highway design, a BDM–MDM integrated solution was developed and applied to the same. Feedback from experts was obtained for refinements.

Findings

The proposed solution is efficient for scheduling multiple entity types and their information dependencies/linkages.

Practical implications

The proposed integrated solution enables the project participants to schedule information-driven projects systematically. Application to two distinct design cases emphasizes that the concept is generic and can be applied to any information-driven project with multiple entity types.

Originality/value

The BDM–MDM integrated solution concept is investigated for scheduling multiple entity types in any information-driven projects. This study also explored the terminologies such as multiple entity types and information-driven scheduling.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal