Purpose

Top-down pressure from donors, public sector inefficiencies and fund deficits have steered the introduction of public–private partnerships (PPPs) in sub-Saharan Africa. However, PPP activities in the water sector have been quite insignificant compared to other infrastructure sectors in this region. In addition, a number of water PPPs have encountered great difficulties and subsequent failures. This study aims at unveiling the underlying reasons behind failures.

Design/methodology/approach

This study has classified the failure types of water PPPs and reviewed the development of water PPPs in sub-Saharan Africa to identify failed ones. Eight failed case studies are completed through the rigorous approach of event sequence mapping.

Findings

Nine root causes of water PPP failure are identified through a thorough examination of these failed water PPP cases and the interrelationships between these failure causes are established. The failure causes are further generalized through literature focusing on water PPP failures in developing countries and problematic issues that hinder the implementation of successful water PPPs across different Sub-Saharan African countries. Recommendations are provided for future improvements in carrying out water PPPs in Sub-Saharan Africa by learning past lessons and drawing experiences.

Originality/value

This is the first case study on water PPP failures in Sub-Saharan Africa from a construction management perspective. This study will help governments and the private sector in developing stronger future water PPPs.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Please enter valid email address.
Email address must be 94 characters or fewer.
Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal