Risk analysis has come to be seen as a quantitative process in which risks are measured by the use of probabilities. However, since every new project is essentially unique with no previous data on it, decisions taken as to the nature of the risks are highly subjective and the actions that may be carried out to mitigate the effects of these risks are not clear‐cut; a non‐numerical approach can, therefore, be more useful. The risk management approach detailed here identifies the risks, checks for dependence amongst risks, and assesses the likelihood of occurrence of each risk by using linguistic variables through the medium of fuzzy sets. The use of linguistic variables is a departure from conventional risk analysis methods that rely rather heavily on statistical analysis to quantify the effects of risks on projects. The entire risk management process is explained, and a case study is carried out to demonstrate the use of the ideas treated. The case study concentrates on the activities of the substructure in a multi‐storey building project. The ten largest risks are identified, and dependence among them is assessed through fuzzy set calculations. The assessment of risk dependencies brings about a reduction in the total number of risks analysed, as highly dependent risks are treated together, and the use of linguistic variables brings about a non‐numeric approach to risk analysis with which project managers can be comfortable. The risk management process, through the use of fuzzy sets, is better able to handle project management knowledge on risk analysis which is highly subjective, and varies from project to project.
Article navigation
1 April 1996
Review Article|
April 01 1996
Risk interdependencies and natural language computations Available to Purchase
E.N. WIRBA;
E.N. WIRBA
School of Construction, South Bank University, Wandsworth Road, London SW8 2JZ, UK
Search for other works by this author on:
J.H.M. TAH;
J.H.M. TAH
School of Construction, South Bank University, Wandsworth Road, London SW8 2JZ, UK
Search for other works by this author on:
R. HOWES
R. HOWES
School of Construction, South Bank University, Wandsworth Road, London SW8 2JZ, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
1996
Engineering, Construction and Architectural Management (1996) 3 (4): 251–269.
Citation
WIRBA E, TAH J, HOWES R (1996), "Risk interdependencies and natural language computations". Engineering, Construction and Architectural Management, Vol. 3 No. 4 pp. 251–269, doi: https://doi.org/10.1108/eb021034
Download citation file:
Suggested Reading
A novel intelligent object-oriented three-dimensional simulation system for physics experimentation
Applied Computing and Informatics (November,2018)
Supplier selection using grey theory: a case study from Indian banking industry
Journal of Enterprise Information Management (October,2015)
A multi-criteria expert-based framework for developing a work stress-management support tool
International Journal of Workplace Health Management (July,2024)
A Monte Carlo simulation of cost risks in modular integrated construction projects in Hong Kong
Smart and Sustainable Built Environment (August,2025)
Why should we bother about urban risk reduction? ERS instrument and a methodology to assess its impact on urban functionality
International Journal of Disaster Resilience in the Built Environment (December,2025)
Related Chapters
Reverse Logistics: Rebuilding Smart and Sustainable Transformation Based on Industry 4.0
Fostering Sustainable Development in the Age of Technologies
What is a Professional Civil Engineer
Initial Professional Development for Civil Engineers
What is a professional civil engineer?
Initial Professional Development for Civil Engineers
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.