Article navigation
Purpose

While previous studies have focused on identifying management control (MC) mechanisms in international construction joint ventures (ICJVs), the impacts of such MC mechanisms on the performance of ICJVs remain largely unknown. This study aims to investigate the impacts of MC mechanisms on the performance of ICJVs hosted in the developing country of Ghana.

Design/methodology/approach

Through a comprehensive review of the literature, a theoretical model was developed, and data were collected through a questionnaire survey with 190 project managers composed of Ghanaians/locals and their foreign partners of ICJVs. The data were analyzed using partial least squares structural equation modeling.

Findings

Results showed that both personnel and support and training control mechanisms have a positive and significant impact on project and company/partner performance. Surprisingly, insignificant and negative impacts exist between both mechanisms and socioenvironmental and company/partner performance from the local partners' view, respectively; the reverse is rather true from the foreign partners' perspective.

Practical implications

This study contributes to the ICJV body of knowledge by analyzing the impacts of MC mechanisms on the ICJVs’ performance, enabling ICJVs frontliners (i.e. top managers) and project managers to better enhance their control structures and the ICJVs’ performance.

Originality/value

This is arguably the first study to take the bipartite perspective rather than the unilateral view of studying the impacts of MC mechanisms on the performance of ICJVs.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options