Article navigation
Purpose

Construction material management is an important process in supporting construction operations that affect project performance. Previous studies attempt to identify factors influencing material management in different stages such as procurement, transportation and utilization. However, they lack a model to explain the relationship between influential factors and the effectiveness of material management. Therefore, this study aims to validate the variables and key factors influencing the effectiveness of material management processes.

Design/methodology/approach

A total of 42 variables were reviewed from literature in different stages of material management process. Survey questionnaires were used to collect data about participants' perceptions on these variables. The respondents were 200 project engineers and project managers from construction sites and offices in Vietnam. Then factor analysis techniques were undertaken to validate the structure of factor groups. Two methods of exploratory factor analysis (EFA) and confirmatory factor analysis (CFA) were, respectively, performed to evaluate and verify the model's fit.

Findings

Factors influencing the effectiveness of material management were grouped into nine main factors, which are procurement issues, site conditions, planning and handling on site, industrial environments, contractual issues, quality control, suppliers and manufacturers' issues, transportation in and out site and security on site.

Practical implications

The paper has several implications for theory and methodology related to material management. It features influential factors in association with the material management effectiveness. Therefore, senior managers can more fully understand the errors in their works and propose timely solutions to limit the unwanted risks.

Originality/value

This research contributes on theoretical development on factors influencing effectiveness of material management processes. The key findings on influential factors can be applied to measure the effectiveness of material management processes.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close Modal
Close Modal