Purpose

There is a general assumption that the early involvement of the contractor contributes to value in construction projects. While early contractor involvement (ECI) may improve the value, some studies identify challenges with ECI. This paper aims to identify the main parameters that can be used to determine the optimal time for contractor involvement and examine how these parameters can be used by clients to develop a systematic method for finding the optimal timing for involvement.

Design/methodology/approach

Literature studies, interviews, workshops and focus-group meetings identified six main parameters essential for developing a method to determine the ideal timing for ECI.

Findings

The six identified parameters are activity, complexity, criticality, technical competencies, relational competencies and uncertainty. These parameters can be used to identify the gap between the available competency in the project team and the needed competency to perform an activity.

Originality/value

Although clients have ways to identify the optimal time for contractor involvement, these ways are mainly subjective and based on in-house practice. By evaluating these six parameters, a more systematic and objective method for early involvement can be developed.

Licensed re-use rights only
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options