The prices of construction resources (construction cost) have been increasing faster than construction output prices (construction price) in Hong Kong since the mid‐1970s, giving rise to a long‐term divergence between the two price trends. As the difference has existed for quite a long time, it cannot be adequately explained by a short‐term change in supply and demand conditions. The present paper introduces the major indices that reflect the trends of the prices of construction resources and outputs in Hong Kong. It also attempts to explain, from an economic point of view, the major factors which contributed to the divergence between the long‐term trends of the prices of construction resources and outputs. One of the conclusions is that, for the past 25 years, the productive efficiency of the Hong Kong building industry has benefited from and been greatly upgraded by imported construction technologies, as well as by a burgeoning quality of human resources. The data and examples quoted in the present paper are sided towards building construction. Therefore, the scope of investigation of this paper, strictly speaking, is confined to the building industry, and does not include the building services and civil engineering subsectors. However, because of the higher degree of mechanization and faster technological progress in the civil engineering and building services subsectors, the present author believes that the results and conclusions should also be applicable to the whole construction industry.
Article navigation
1 January 1998
Review Article|
January 01 1998
The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong Available to Purchase
K.W. CHAU
K.W. CHAU
Department of Real Estate and Construction, Faculty of Architecture, The University of Hong Kong, Pokfulam Road, Hong Kong
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
1998
Engineering, Construction and Architectural Management (1998) 5 (1): 38–50.
Citation
CHAU K (1998), "The implications of the difference in the growth rates of the prices of building resources and outputs in Hong Kong". Engineering, Construction and Architectural Management, Vol. 5 No. 1 pp. 38–50, doi: https://doi.org/10.1108/eb021059
Download citation file:
Suggested Reading
Tender prices fairly steady over next five years BCIS five year forecast of tender prices to first quarter 2005
Facilities (January,2001)
Structural Safety 1997-99: Review and Recommendations
Structural Survey (September,1999)
Training for better integrated building services
Facilities (December,2000)
Productivity monitoring and performance evaluation of construction project using computer vision
Construction Innovation: Information Process Management (September,2025)
Oscar Faber is the Large Consultancy of the Year with the Best Practice of the Year
Facilities (December,2001)
Related Chapters
Using an Adaptive Neuro-fuzzy Inference System for Tender Price Index Forecasting: A Univariate Approach
Fuzzy Hybrid Computing in Construction Engineering and Management: Theory and Applications
Institutions, Technological Change and Wage Differentials between Skilled and Unskilled Workers: Theory and Evidence from Europe
Research in Labor Economics
Sources of Competitiveness and Multinationality: Emerging Market Firms in the Electronics Industry
Emerging Economies and Multinational Enterprises
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.