Waste minimization strategies and the relative significance of construction waste sources were examined using a survey of 24 construction firms operating in Australia. The results indicated that a sizeable proportion of respondent firms did not have specific policies for minimizing waste. Furthermore, while a majority of firms with specific waste minimization policies made efforts to minimize waste at source, i.e. to avoid generating waste in the first place, this minimization was limited to waste generated by site offices and amenities. Potential scope exists for improving the effectiveness of waste minimization at source by addressing the sources of all waste generated during the construction phase. The survey results indicated that the five most significant sources of construction waste were design changes, leftover material scraps, wastes from packaging and non‐reclaimable consumables, design/detailing errors, and poor weather. Potential opportunities for minimizing the amount of waste generated on construction project sites are identified.
Article navigation
1 February 1998
Review Article|
February 01 1998
Minimizing waste on construction project sites
O.O. FANIRAN;
O.O. FANIRAN
Correspondence: Dr O.O. Faniran, 1/5–7 Riverview Street, West Ryde, NSW 2114, Australia
Search for other works by this author on:
G. CABAN
G. CABAN
Faculty of Design, Architecture and Building, University of Technology, Sydney, PO Box 123, Broadway, NSW 2007, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
1998
Engineering, Construction and Architectural Management (1998) 5 (2): 182–188.
Citation
FANIRAN O, CABAN G (1998), "Minimizing waste on construction project sites". Engineering, Construction and Architectural Management, Vol. 5 No. 2 pp. 182–188, doi: https://doi.org/10.1108/eb021073
Download citation file:
New and popular articles
Suggested Reading
From crisis to comeback: the Silkyara collapse
Emerald Emerging Markets Case Studies (March,2025)
From crisis to comeback: the Silkyara collapse
Teaching Notes (March,2025)
Strategies for construction waste management in Ho Chi Minh City, Vietnam
Built Environment Project and Asset Management (July,2013)
Global Environment Outlook 2000 (GEO-2000)
International Journal of Sustainability in Higher Education (April,2000)
Food waste volume and composition in Finnish households
British Food Journal (May,2014)
Related Chapters
Sustainable Road Infrastructure Development in Ghana
Sustainable Road Infrastructure Project Implementation in Developing Countries: An Integrated Model
Ceramic tiles waste as replacement material in Portland cement
ICE Themes Low Carbon Concrete
The transport and beneficial re-use of Crossrail excavated material
Crossrail Project: Infrastructure design and construction
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.