The application of an artificial neural network (ANN) to forecast the construction duration of buildings at the predesign stage is described in this paper. A three‐layered back‐propagation (BP) network consisting of 11 input nodes has been constructed. Ten binary input nodes represent basic information on building features (i.e. building function, structural system, foundation, height, exterior finishing, quality of interior decorating, and accessibility to the site), and one real‐value input represents functional area. The input nodes are fully connected to one output node through hidden nodes. The network was implemented on a Pentium‐150 based microcomputer using a neurocomputer program written in C+ +. The Generalized Delta Rule (GDR) was used as learning algorithm. One hundred and thirty‐six buildings built during the period 1987–95 in the Greater Bangkok area were used for training and testing the network. The determination of the optimum number of hidden nodes, learning rate, and momentum were based on trial‐and‐error. The best network was found to consist of six hidden nodes, with a learning rate of 0.6, and null momentum. It was trained for 44700 epochs within 943 s such that the mean squared error (judgement) of training and test samples were reduced to 1.17 × 10−7 and 3.10 × 10−6, respectively. The network can forecast construction du‐ration at the predesign stage with an average error of 13.6%.
Article navigation
1 February 1999
Review Article|
February 01 1999
Application of artificial neural network to forecast construction duration of buildings at the predesign stage
SDHABHON BHOKHA;
SDHABHON BHOKHA
School of Civil Engineering, Asian Institute of Technology, P.O.Box 4, Khlong Luang, Pathumthani 12120, Thailand
Search for other works by this author on:
STEPHEN O. OGUNLANA
STEPHEN O. OGUNLANA
School of Civil Engineering, Asian Institute of Technology, P.O.Box 4, Khlong Luang, Pathumthani 12120, Thailand
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
1999
Engineering, Construction and Architectural Management (1999) 6 (2): 133–144.
Citation
BHOKHA S, OGUNLANA SO (1999), "Application of artificial neural network to forecast construction duration of buildings at the predesign stage". Engineering, Construction and Architectural Management, Vol. 6 No. 2 pp. 133–144, doi: https://doi.org/10.1108/eb021106
Download citation file:
New and popular articles
Suggested Reading
The Use of Fabric Surface and Mechanical Properties to Predict Fabric Hand Stiffness
Research Journal of Textile and Apparel (May,2005)
Three autoregressive-neural network hybrid models for energy efficiency estimation of induction motors
COMPEL (November,2018)
Darcy–Forchheimer hybrid nanofluid flow in a squeezing inclined channel for drug delivery applications by means of artificial neural network
Multidiscipline Modeling in Materials and Structures (December,2024)
Investigation of the effect of AWJ drilling parameters for delamination factor and surface roughness on GFRP composite material
Multidiscipline Modeling in Materials and Structures (August,2022)
Prediction of mechanical properties and optimization of process parameters in friction-stir-welded dissimilar aluminium alloys
World Journal of Engineering (May,2020)
Related Chapters
In Situ Durability Assessment of Natural Composite Structures by Considering Artificial Neural Network (ANN) Modelling
Artificial Intelligence, Engineering Systems and Sustainable Development: Driving the UN SDGs
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.