The traditional network scheduling methods such as the Critical Path Method (CPM), Programme Evaluation Review Technique (PERT), and bar charting are typically not effective for the planning of linear construction projects. Linear scheduling methods, on the other hand, model the progress of repetitive activities in sloping lines and are more effective for linear modelling and analysis. Nonetheless, their use in the construction industry has so far been very limited. Among other reasons for this is the unfamiliarity of construction personnel with these techniques, which plays a major role in hampering their application. This paper introduces a graphically based approach to assist in the linear programming (LP) modelling of linear scheduling analysis. The Planning & Optimization for Linear Operations (POLO) system provides a graphic LP modelling environment in which model formulation can be easily accomplished in a graphic and interactive fashion. Thus, the application of linear scheduling methods can be facilitated. The Isle of Palms Connector Bridge project in Mount Pleasant, South Carolina is used to demonstrate the use of the system.
Article navigation
1 January 2000
Review Article|
January 01 2000
Graphically based LP modelling for linear scheduling analysis: the POLO system
RONG‐YAU HUANG;
RONG‐YAU HUANG
Department of Civil Engineering, National Central University, Chung‐li, Taiwan 32054, Republic of China
Search for other works by this author on:
DANIEL W. HALPIN
DANIEL W. HALPIN
Department of Civil Engineering, National Central University, Chung‐li, Taiwan 32054, Republic of China
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2000
Engineering, Construction and Architectural Management (2000) 7 (1): 41–51.
Citation
HUANG R, HALPIN DW (2000), "Graphically based LP modelling for linear scheduling analysis: the POLO system". Engineering, Construction and Architectural Management, Vol. 7 No. 1 pp. 41–51, doi: https://doi.org/10.1108/eb021131
Download citation file:
New and popular articles
Suggested Reading
Optimized crew selection for scheduling of repetitive projects
Engineering, Construction and Architectural Management (August,2020)
Time–cost–quality trade-off analysis for planning construction projects
Engineering, Construction and Architectural Management (November,2019)
Adaptive virtual team planning and coordination: a mathematical programming approach
Journal of Modelling in Management (July,2024)
The application of queuing theory in the analysis of plant layout
International Journal of Operations & Production Management (January,1996)
Optimization of triage time and sample delivery path in health infrastructure to combat COVID-19
Engineering, Construction and Architectural Management (March,2022)
Related Chapters
Resource Acquisition in High-Tech Start-up Global Strategies
Exploration and Exploitation in Early Stage Ventures and SMEs
Balancing Act: Leveraging Tradition in the Pursuit of Innovation
Tradition as Resource or Constraint for Strategic Action
Cultural Perspectives on Wealth and Prosperity in Indigenous Communities
Indigenous Empowerment through Human-Machine Interactions: The Challenges and Strategies from Business Lenses
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.