The construction sector is under growing pressure to increase productivity and improve quality, most notably in reports by Latham (1994, Constructing the Team, HMSO, London) and Egan (1998, Rethinking Construction, HMSO, London). A major problem for construction companies is the lack of project predictability. One method of increasing predictability and delivering increased customer value is through the systematic management of construction processes. However, the industry has no methodological mechanism to assess process capability and prioritise process improvements. Standardized Process Improvement for Construction Enterprises (SPICE) is a research project that is attempting to develop a stepwise process improvement framework for the construction industry, utilizing experience from the software industry, and in particular the Capability Maturity Model (CMM), which has resulted in significant productivity improvements in the software industry. This paper introduces SPICE concepts and presents the results from two case studies conducted on design and build projects. These studies have provided further in‐sight into the relevance and accuracy of the framework, as well as its value for the construction sector.
Article navigation
1 March 2000
Review Article|
March 01 2000
SPICE: a business process diagnostics tool for construction projects
M. SARSHAR;
M. SARSHAR
School of Construction and Property Management, University of Salford, Salford M7 9NU, UK
Search for other works by this author on:
R. HAIGH;
R. HAIGH
School of Construction and Property Management, University of Salford, Salford M7 9NU, UK
Search for other works by this author on:
M. FINNEMORE;
M. FINNEMORE
School of Construction and Property Management, University of Salford, Salford M7 9NU, UK
Search for other works by this author on:
G. AOUAD;
G. AOUAD
School of Construction and Property Management, University of Salford, Salford M7 9NU, UK
Search for other works by this author on:
P. BARRETT;
P. BARRETT
School of Construction and Property Management, University of Salford, Salford M7 9NU, UK
Search for other works by this author on:
D. BALDRY;
D. BALDRY
School of Construction and Property Management, University of Salford, Salford M7 9NU, UK
Search for other works by this author on:
M. SEXTON
M. SEXTON
School of Construction and Property Management, University of Salford, Salford M7 9NU, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2000
Engineering, Construction and Architectural Management (2000) 7 (3): 241–250.
Citation
SARSHAR M, HAIGH R, FINNEMORE M, AOUAD G, BARRETT P, BALDRY D, SEXTON M (2000), "SPICE: a business process diagnostics tool for construction projects". Engineering, Construction and Architectural Management, Vol. 7 No. 3 pp. 241–250, doi: https://doi.org/10.1108/eb021149
Download citation file:
New and popular articles
Suggested Reading
Improving project processes: best practice case study
Construction Innovation: Information Process Management (June,2004)
Achieving customer service excellence using Lean Pull Replenishment
International Journal of Productivity and Performance Management (November,2012)
Toward a maturity model for the application of social media in healthcare: The health 2.0 roadmap
Online Information Review (September,2018)
Managing Process Capability
Mid-American Journal of Business (October,1999)
Evaluating reverse logistics programs: a suggested process formalization
The International Journal of Logistics Management (August,2011)
Related Chapters
Using process capability analysis and simulation to improve patient flow
Applications of Management Science
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
