Construction time performance (CTP) factors recently identified in work commissioned by the Construction Industry Institute Australia (CIIA) indicate that project team effectiveness significantly influences CTP. Project complexity also was found to significantly contribute to CTP. However, no residential projects were studied in that survey. This paper reports upon CTP research undertaken into Australian multi‐unit residential construction that fills this theory gap. Results indicate that the construction management (CM) team's effectiveness in managing theconstruction process has a major but not predominant role in influencing CTP. Team communication effectiveness and teamwork factors are also essential factors influencing CTP. Other factors found to affect CTP include: design team's management style; intra‐team working relationships; the degree of experience and expertise for the same type and size of project; procurement method; and the level of the CM team's current workload.
Article navigation
1 March 2000
Review Article|
March 01 2000
Australian multi‐unit residential project construction time performance factors Available to Purchase
DEREK H.T. WALKER;
DEREK H.T. WALKER
Department of Building and Construction Economics, RMIT, Melbourne, Australia
Search for other works by this author on:
MARK W. VINES
MARK W. VINES
Department of Building and Construction Economics, RMIT, Melbourne, Australia
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2000
Engineering, Construction and Architectural Management (2000) 7 (3): 278–284.
Citation
WALKER DH, VINES MW (2000), "Australian multi‐unit residential project construction time performance factors". Engineering, Construction and Architectural Management, Vol. 7 No. 3 pp. 278–284, doi: https://doi.org/10.1108/eb021152
Download citation file:
Suggested Reading
The contribution of the client representative to the creation and maintenance of good project inter‐team relationships
Engineering, Construction and Architectural Management (January,1998)
Briefing: The adverse health and safety influence of subcontracting
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (November,2011)
Briefing: A strategy for clients for procurement of good health and safety
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (May,2011)
Critical success factors in a public–private partnership highway project in Malaysia: Ampang–Kuala Lumpur Elevated Highway
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (January,2018)
Could the NEC be widely used in New Zealand?
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law (August,2008)
Related Chapters
Functional-Level Transformation in Multi-Domestic MNCs: Transforming Local Purchasing into Globally Integrated Purchasing
Orchestration of the Global Network Organization
Unsolicited Proposals in Infrastructure – Lessons from Brazil and Chile
The Emerald Handbook of Public–Private Partnerships in Developing and Emerging Economies: Perspectives on Public Policy, Entrepreneurship and Poverty
11 The Participation of Smallholder Farmers in High-Value Export Markets Governed by Standards: The Role of Exporter Procurement Practices
Nontariff Measures with Market Imperfections: Trade and Welfare Implications
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.