Earned Value Analysis (EVA) is an accepted theoretical technique advocated for the control of projects. This paper attempts to refine and improve the performance of traditional EVA by the introduction of a hybrid methodology based on work packages and logical time analysis entitled Work Package Methodology (WPM). The proposed WPM provides the means to periodically update project cost and time performance by restricting EVA calculations to individual work packages. These are then subjected to a logical time analysis to determine the predicted project cost and time to completion. A comparative analysis between WPM and EVA is then undertaken using adapted test data derived from knowledge of previous projects to identify the reasons for variation in the results obtained from both methods. The evaluation of the test results indicates that when the Cost Performance Index (CPI) and the Schedule Performance Index (SPI) are well above or below unity then, especially in the early stages of the project, traditionally applied EVA predictions can be un‐realiable and require further investigation and evaluation. WPM provides a vehicle for judging the performance of EVA by applying an alternative logical time and cost utilizing work sequence and construction methods. The predictive performance of EVA is refined by these means.
Article navigation
1 April 2000
Review Article|
April 01 2000
Improving the performance of Earned Value Analysis as a construction project management tool
RODNEY HOWES
RODNEY HOWES
Faculty of the Built Environment, South Bank University, 202 Wandsworth Road, London SW8 2JZ, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2000
Engineering, Construction and Architectural Management (2000) 7 (4): 399–411.
Citation
HOWES R (2000), "Improving the performance of Earned Value Analysis as a construction project management tool". Engineering, Construction and Architectural Management, Vol. 7 No. 4 pp. 399–411, doi: https://doi.org/10.1108/eb021162
Download citation file:
New and popular articles
Suggested Reading
Application framework for safety-centric construction acceleration planning
Engineering, Construction and Architectural Management (January,2022)
Major causes of construction time and cost overruns: A case of selected educational sector projects in Ghana
Journal of Engineering, Design and Technology (April,2017)
Rework and schedule performance: A profile of incidence, impact, causes and solutions
Engineering, Construction and Architectural Management (March,2014)
Contribution to the investment evaluation in terms of the forest fires prevention using the cost-benefit analysis method
Management of Environmental Quality: An International Journal (August,2017)
Earned value‐based performance monitoring of facility construction projects
Journal of Facilities Management (February,2013)
Related Chapters
Construction Programmes and Programming: A Critical Review
10th Nordic Conference on Construction Economics and Organization
Quality Evaluation of Contractor’s Schedule in the Bidding Phase
10th Nordic Conference on Construction Economics and Organization
Surviving Senior Seminar Research: Helpful Strategies for Improving Overall Project Performance
Infusing Undergraduate Research into Historically Black Colleges and Universities Curricula
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.