Although line‐of‐balance (LOB) scheduling can be superior to bar charts and networks in repetitive‐unit construction, there are indications that its use is not widespread. In this study, the major limitations of the existing LOB methodology are identified and then eliminated by developing a computer program called repetitive unit scheduling system (RUSS). An effective algorithm that facilitates the implementation of LOB scheduling is developed. A tool that handles logical and strategic limitations caused by the particular characteristics of repetitive activities is provided. A learning model is developed and incorporated into LOB calculations. The program is designed to optimize resource allocation by using multiples of the natural rhythm of activities. An optimum crew size that guarantees maximum productivity in an activity is used throughout the LOB calculations to achieve cost‐optimized schedules. Non‐linear and discrete activities are incorporated into the LOB calculations. RUSS displays the LOB diagram of every individual path in the unit network. It is believed that a system such as RUSS will make the LOB method more appealing to contractors of repetitive projects.
Article navigation
1 February 2001
Review Article|
February 01 2001
Scheduling system for repetitive unit construction using line‐of‐balance technology
DAVID ARDITI;
DAVID ARDITI
Depanmem of Civil and Architectural Engineering, Illinois Institute of Technology, Chicago, IL 60660, USA
Search for other works by this author on:
ONUR B. TOKDEMIR;
ONUR B. TOKDEMIR
Depanmem of Civil and Architectural Engineering, Illinois Institute of Technology, Chicago, IL 60660, USA
Search for other works by this author on:
KANGSUK SUH
KANGSUK SUH
Department of Civil Engineering, Honam University, Honam, South Korea
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2001
Engineering, Construction and Architectural Management (2001) 8 (2): 90–103.
Citation
ARDITI D, TOKDEMIR OB, SUH K (2001), "Scheduling system for repetitive unit construction using line‐of‐balance technology". Engineering, Construction and Architectural Management, Vol. 8 No. 2 pp. 90–103, doi: https://doi.org/10.1108/eb021173
Download citation file:
New and popular articles
Suggested Reading
Work continuity constraints in repetitive project scheduling considering soft logic
Engineering, Construction and Architectural Management (September,2020)
Linear scheduling: past research efforts and future directions
Engineering, Construction and Architectural Management (March,1998)
Optimized scheduling and buffering of repetitive construction projects under uncertainty
Engineering, Construction and Architectural Management (November,2016)
Optimizing the scheduling of crew deployments in repetitive construction projects under uncertainty
Engineering, Construction and Architectural Management (August,2020)
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.