Plans of work for construction projects are published by various interest groups with increasing frequency. Each purports to explain how (all) construction projects should be organized and it can be very difficult to assess their relative benefits and the circumstances most appropriate for their use. Techniques for analysing organizational structures have been available for some decades, but are rarely applied to construction projects. Such techniques can be criticized for omitting non‐structural aspects of project management, such as leadership and other behavioural traits but they are ideal for analysing the strengths and weaknesses of documents describing formal organizational structures. A model for evaluating plans of work is presented and by way of example, a scheme produced by the Construction Industry Board (CIB, UK) is analysed by comparison with the Royal Institute of British Architects (RIBA) plan of work. The results show that the CIB scheme does not provide proper guidance for the management of projects, neither does it allocate responsibilities to participants. This analysis shows that such techniques are capable of providing useful benchmarks for assessing the differences between plans of work. They enable impartial assessment of the strengths and weaknesses of different schemes.
Skip Nav Destination
Article navigation
1 April 2001
Review Article|
April 01 2001
Evaluating plans of work Available to Purchase
WILL HUGHES
WILL HUGHES
Department of Construction Management & Engineering, University of Reading, PO Box 219, Reading RG6 6AW, UK
Search for other works by this author on:
Publisher: Emerald Publishing
Online ISSN: 1365-232X
Print ISSN: 0969-9988
© MCB UP Limited
2001
Engineering, Construction and Architectural Management (2001) 8 (4): 272–283.
Citation
HUGHES W (2001), "Evaluating plans of work". Engineering, Construction and Architectural Management, Vol. 8 No. 4 pp. 272–283, doi: https://doi.org/10.1108/eb021188
Download citation file:
Suggested Reading
A comparison of two editions of the RIBA Plan of Work
Engineering, Construction and Architectural Management (October,2003)
Institutional contradiction and BSC implementation: comparative organizational analysis
International Journal of Organizational Analysis (December,2018)
Effects of cultural assimilation on the performance of a construction project – evidence from UAE
Benchmarking: An International Journal (April,2014)
Diagnosis for organizational knowledge creation: an ontological shift SECI model
Journal of Knowledge Management (October,2010)
Association‐sponsored benchmarking programs
Benchmarking: An International Journal (August,2000)
Related Chapters
An Inter-Organizational Case Study Between a Public American University and Six US Corporations
University–Community Partnerships for Promoting Social Responsibility in Higher Education
Discipline, Ethics, and the Prohibitions in Divine Exchange Law and Their Implications for Ethical Finance
Islamic Finance as an Ethical and Responsible Finance: Exploring a New Paradigm of Shared Growth, Welfare, and Sustainability
Evaluating Effective Performance Using Ordered Weighted Averaging and Data Envelopment Analysis Optimization
Applications of Management Science
Recommended for you
These recommendations are informed by your reading behaviors and indicated interests.
