Article navigation

This paper presents a research study conducted for evaluating the effectiveness of a conceptual model of a distributed process management environment in the establishment of a collaborative building design. At the highest level, the conceptual model of the distributed process management environment have the following features: (a) enables description of a plan of a design process, (b) enables enactment of a process according to its plan, and (c) enables control and management of the enactment of a design process. The paper also presents the findings of a verification and validation (V & V) study conducted for evaluating the fit between the needs and expectations of collaborating design groups and the solution provided by the conceptual model of the distributed process management environment.

This content is only available via PDF.
You do not currently have access to this content.
Don't already have an account? Register

Purchased this content as a guest? Enter your email address to restore access.

Pay-Per-View Access
$41.00
Rental

or Create an Account

Close subscription notice
Close access options