Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: 5D BIM
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Scan-to-BIM approach for enhanced semi-automated cost management in modular off-site construction
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (2): 898–913.
Published: 05 December 2025
...Amirhossein Mehdipoor; Mohamed Al-Hussein; Ivanka Iordanova Purpose This research integrates lean construction principles with scan-to–building information modeling (BIM) to enhance cost management in modular off-site construction. It proposes a scan-to-BIM approach within a semi-automated 5D-BIM...
Journal Articles
Revolutionising cost structure for integrated project delivery: a BIM-based solution
Available to Purchase
Engineering, Construction and Architectural Management (2021) 28 (4): 1214–1240.
Published: 10 August 2020
... estimation, offering three main contributions: (1) an innovate approach to utilise five-dimensional (5D) BIM capabilities with Monte Carlo simulation, hence providing reliable cost estimating during the conceptual TVD stage; (2) mathematical models that are developed through integrating ABC into the detailed...
