Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-5 of 5
Keywords: Bridges
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Developing a tailored RBS linking to BIM for risk management of bridge projects
Available to Purchase
Engineering, Construction and Architectural Management (2016) 23 (6): 727–750.
Published: 21 November 2016
...Yang Zou; Arto Kiviniemi; Stephen W. Jones Purpose The purpose of this paper is to address the current theoretical gap in integrating knowledge and experience into Building Information Model (BIM) for risk management of bridge projects by developing a tailored Risk Breakdown Structure (RBS...
Journal Articles
Minimising uncertainty in long‐term prediction of bridge element
Available to Purchase
Engineering, Construction and Architectural Management (2013) 20 (2): 127–142.
Published: 22 February 2013
...Jaeho Lee; Michael Blumenstein; Hong Guan; Yew‐Chaye Loo Purpose Successful bridge management system (BMS) development requires a reliable bridge deterioration model, which is the most crucial component in a BMS. Historical condition ratings obtained from biennial bridge inspections are a major...
Journal Articles
A multi‐attribute ranking method for bridge management
Available to Purchase
Engineering, Construction and Architectural Management (2010) 17 (3): 282–291.
Published: 04 May 2010
...Saleh Abu Dabous; Sabah Alkass Purpose A bridge network is a major capital asset that requires continuing investment in order to maintain the network within acceptable limits of safety and serviceability. Ranking and prioritizing procedures have been widely used by several departments...
Journal Articles
Enhancing the capability of rapid bridge replacement after extreme events
Available to Purchase
Engineering, Construction and Architectural Management (2007) 14 (4): 375–386.
Published: 10 July 2007
...Yong Bai; Seong Hoon Kim; William R. Burkett Purpose The potential threats of extreme events to highway bridges have received increased attention from government agencies, the engineering and construction communities, and the traveling public. These events include terrorist attacks as well...
Journal Articles
An application of case‐based reasoning to the planning of highway bridge construction
Available to Purchase
Engineering, Construction and Architectural Management (1998) 5 (4): 327–338.
Published: 01 April 1998
.... © MCB UP Limited 1998 Case‐based reasoning (CBR) Construction planning and control Decision support Knowledge‐based system Bridges Engineering, Construction and Architectural Management 1998 5 | 4, 327-338 An application of case-based reasoning to the planning of highway bridge...
