Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Claims
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (9): 3817–3839.
Published: 28 June 2022
...Sy Tien Do; Viet Thanh Nguyen; Nghia Hoai Nguyen Purpose This study aims to examine the mutual influence of causes of variation orders (VOs), claims/disputes (CDs) on project performance (PP) and stakeholder performance (SP). Design/methodology/approach Firstly, this study identifies the VOs...
Journal Articles
Engineering, Construction and Architectural Management (2021) 28 (4): 1014–1037.
Published: 03 August 2020
...Ratnesh Kumar; K. Chandrashekhar Iyer; Surya Prakash Singh Purpose In construction management, risks and claims are treated separately, but several studies tacitly acknowledge a strong link between the two. In this context, this research intends to investigate whether risks and claims have...
Includes: Supplementary data
Journal Articles
Engineering, Construction and Architectural Management (2001) 8 (5-6): 317–324.
Published: 01 May 2001
...R.A. HARRIS; S. SCOTT The paper describes four methods of dealing with delay claims that effectively sum up the main approaches to this problem that have been offered in the literature. This is then followed by a description and discussion of results from a new survey aimed at finding out exactly...
Journal Articles
Engineering, Construction and Architectural Management (1997) 4 (2): 95–111.
Published: 01 February 1997
...MOHAN M. KUMARASWAMY It is necessary and useful to differentiate destructive from constructive conflict and avoidable from necessary claims; and also to minimize disputes arising from unresolved conflict and claims in construction projects. This paper analyses such needs and proposes means...
