Skip Nav Destination
Close Modal
Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-2 of 2
Keywords: Cross-border construction logistics and supply chain
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Evaluating the critical resultant impacts of the COVID-19 pandemic on quality assurance of cross-border construction logistics and supply chain
Available to Purchase
Engineering, Construction and Architectural Management (2025) 32 (10): 6665–6689.
Published: 23 August 2024
...Frank Ato Ghansah; Weisheng Lu Purpose This study aims to identify and examine the critical resultant impacts of the coronavirus (COVID-19) pandemic on quality assurance (QA) of cross-border construction logistics and supply chain (CB-CLSC). Design/methodology/approach This is achieved via...
Includes: Supplementary data
Journal Articles
Modelling the critical challenges of quality assurance of cross-border construction logistics and supply chain during the COVID-19 pandemic
Available to Purchase
Engineering, Construction and Architectural Management (2024) 31 (5): 2128–2150.
Published: 26 March 2024
...). A two-round literature search was conducted in this study. With the first round, specific keywords, such as “challenges”, “barriers”, “COVID-19”, “coronavirus*” (* denotes fuzzy search), “quality assurance”, “quality management”, “cross-border construction”, “logistics and supply chain” and other...
Includes: Supplementary data
