Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-7 of 7
Keywords: Delay
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Analysis on risk factors related delay in PCPs
Available to Purchase
Engineering, Construction and Architectural Management (2023) 30 (10): 4609–4644.
Published: 04 July 2022
...Ying Zhao; Wei Chen; Zhuzhang Yang; Zongliang Li; Yong Wang Purpose Risk factors related delay hinder the schedule performance of most construction projects in the world. It is a critical challenge to realize the advantages of prefabricated construction projects (PCPs) under the negative effect...
Journal Articles
Quantifying costs of the productivity loss due to schedule changes in construction projects
Available to Purchase
Engineering, Construction and Architectural Management (2023) 30 (1): 56–73.
Published: 13 October 2021
...” (CSI2) model is proposed to objectively show and estimate lost productivity due to changes in construction projects. Findings A schedule-based analysis to include separate tracking of change order costs can be used to predict productivity due to the delay and disruption; changes in construction...
Journal Articles
A cartography of delay risks in the Australian construction industry: impact, correlations and timing
Available to Purchase
Engineering, Construction and Architectural Management (2021) 28 (7): 1952–1978.
Published: 30 September 2020
...Hossein Derakhshanfar; J. Jorge Ochoa; Konstantinos Kirytopoulos; Wolfgang Mayer; Craig Langston Purpose The purpose of this research is to identify the most impactful delay risks in Australian construction projects, including the associations amongst those risks as well as the project phases...
Journal Articles
Critical overrun causations in marine projects
Available to Purchase
Engineering, Construction and Architectural Management (2020) 27 (7): 1579–1594.
Published: 21 April 2020
...Hamidreza Karami; Oluwole Alfred Olatunji Purpose Delay causations in infrastructure projects are well reported in normative literature. However, very little is known regarding the environment-related causations which can assist in developing mitigation strategies. This study aims to examine...
Journal Articles
Construction delay risk taxonomy, associations and regional contexts: A systematic review and meta-analysis
Available to Purchase
Engineering, Construction and Architectural Management (2019) 26 (10): 2364–2388.
Published: 25 June 2019
...Hossein Derakhshanfar; J. Jorge Ochoa; Konstantinos Kirytopoulos; Wolfgang Mayer; Vivian W.Y. Tam Purpose The purpose of this paper is to systematically develop a delay risk terminology and taxonomy. This research also explores two external and internal dimensions of the taxonomy to determine how...
Journal Articles
Phase-based analysis of key cost and schedule performance causes and preventive strategies: Research trends and implications
Available to Purchase
Engineering, Construction and Architectural Management (2018) 25 (8): 1009–1033.
Published: 14 August 2018
...Mohammadreza Habibi; Sharareh Kermanshachi Purpose It is estimated that more than half of the construction industry’s projects encounter significant cost overruns and major delays, resulting in the industry having a tarnished reputation. Therefore, it is crucial to identify key project cost...
Journal Articles
Green building projects: schedule performance, influential factors and solutions
Available to Purchase
Engineering, Construction and Architectural Management (2015) 22 (3): 327–346.
Published: 18 May 2015
... been analyzed, face-to-face interviews were conducted with two senior project managers to solicit comments on the survey results. Findings – This study identified the degree of project delay in 98 new green building projects and 51 retrofitting green building projects in Singapore. The result...
