Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-4 of 4
Keywords: Earned value management
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Hybrid linear–nonlinear regression models for early-stage prediction of construction delay using environmental and earned value indicators
Available to Purchase
Engineering, Construction and Architectural Management 1–15.
Published: 26 March 2026
...Anuj Kumar Singh; D.A. Patel; V.H. Lad Purpose This study proposes a hybrid linear–nonlinear regression framework for early-stage prediction of construction schedule delay by integrating environmental indicators with Earned Value Management (EVM) metrics during the first 20% of project duration...
Journal Articles
Selecting EVM, ESM and EDM(t) for managing construction project schedule
Available to Purchase
Engineering, Construction and Architectural Management (2024) 31 (12): 4988–5006.
Published: 16 June 2023
...Jyh-Bin Yang; Tzu-Hua Lai Purpose This study aims to review earned value management (EVM)-relative methods, including the original EVM, earned schedule method (ESM) and earned duration management (EDM(t)). This study then proposes a general implementation procedure and some basic principles...
Journal Articles
Stability and accuracy of deterministic project duration forecasting methods in earned value management
Available to PurchaseAlexis Barrientos-Orellana, Pablo Ballesteros-Pérez, Daniel Mora-Melia, Maria Carmen González-Cruz, Mario Vanhoucke
Engineering, Construction and Architectural Management (2022) 29 (3): 1449–1469.
Published: 30 April 2021
...Alexis Barrientos-Orellana; Pablo Ballesteros-Pérez; Daniel Mora-Melia; Maria Carmen González-Cruz; Mario Vanhoucke Purpose Earned Value Management (EVM) is a project monitoring and control technique that enables the forecasting of a project's duration. Many EVM metrics and project duration...
Includes: Supplementary data
Journal Articles
Project control and forecast assessment of building projects in Pakistan using earned value management
Available to Purchase
Engineering, Construction and Architectural Management (2022) 29 (2): 842–869.
Published: 25 March 2021
...Hafiz Zahoor; Rashid Mehmood Khan; Ahsan Nawaz; Muhammad Ayaz; Ahsen Maqsoom Purpose Earned Value Management (EVM) is widely used as a project performance measurement and forecasting technique. Nonetheless, it has not been fully explored in Pakistani construction industry; where conventional...
