Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Entropy weight method
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Identification and evaluation of key stakeholders in mega construction projects: social network analysis and multi-criteria decision-making
Available to Purchase
Engineering, Construction and Architectural Management 1–38.
Published: 05 November 2025
...) methods to identify and evaluate key stakeholders in MCPs. First, a stakeholder network model is constructed using SNA, and the structural metrics of each node are calculated. Next, the Entropy Weight Method (EWM) is introduced to determine the objective weights of the indicators, minimizing subjective...
Journal Articles
A lifecycle-based risk assessment framework for prefabricated building supply chains using G1-entropy weight and cloud matter-element models
Available to Purchase
Engineering, Construction and Architectural Management (2025)
Published: 27 May 2025
... effective management and decision-making. Design/methodology/approach A comprehensive risk indicator system was developed, consisting of 7 primary and 21 secondary indicators covering internal and external risks across the full lifecycle of PB projects. The G1 method and entropy weight method were...
Journal Articles
Optimizing supplier selection for prefabricated components: a comprehensive evaluation
Available to Purchase
Engineering, Construction and Architectural Management (2026) 33 (2): 1649–1677.
Published: 23 December 2024
... contributing to the sustainable development of the construction industry. Design/methodology/approach The entropy weight method is used to integrate and rank 19 commonly used evaluation indices, forming a supplier evaluation system from the enterprises perspective. Subsequently, the VIKOR multi-attribute...
Includes: Supplementary data
