Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Flexibility
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Tennakoon Mudiyanselage Maheshi Pabasara Tennakoon, Nicholas Chileshe, Raufdeen Rameezdeen, J. Jorge Ochoa, Aparna Samaraweera
Engineering, Construction and Architectural Management (2025) 32 (13): 104–132.
Published: 19 March 2025
...://creativecommons.org/licences/by/4.0/legalcode Resilience Governance Transaction cost Procurement Agility Flexibility Visibility The global administration of offsite construction supply chain operations faced significant disruptions due to COVID-19. It brought deficiencies in existing supply chain...
Journal Articles
Engineering, Construction and Architectural Management (1998) 5 (2): 189–198.
Published: 01 February 1998
... such as the Engineering and Construction Contract. As an intermediate step, emergency procedures are suggested. These could be easily incorporated into the existing traditional forms of contract, providing temporary flexibility during a crisis, while at the same time, affording an element of managerial control. © MCB...
Journal Articles
Engineering, Construction and Architectural Management (1995) 2 (4): 307–315.
Published: 01 April 1995
...JOHN HALLIDAY The introduction of the New Engineering Contract (NEC) in the United Kingdom came at a time when the Royal Hong Kong Jockey Club were embarking on major contract works. This new contract provided the type of simple, flexible document ideal for our organization, which seeks to enter...
