Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-5 of 5
Keywords: Fuzzy
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management 1–24.
Published: 26 December 2025
... literature review was conducted to establish the theoretical foundation. Qualitative data were gathered through project site visits and the analysis of government official documents. For quantitative analysis, the study utilised the fuzzy set theory-based critical path method (CPM) and Program Evaluation...
Journal Articles
Engineering, Construction and Architectural Management (2023) 30 (6): 2463–2480.
Published: 29 March 2022
... panel, which was conducted with 12 experts who have experience in delay analysis domain in mega airport projects. Later, fuzzy VIKOR (VIsekriterijumska optimizacija i KOmpromisno Resenje) approach was conducted by considering the detected selection criteria and the most common delay analysis methods...
Journal Articles
Engineering, Construction and Architectural Management (2020) 27 (7): 1595–1618.
Published: 04 June 2020
...Mozhdeh Rostamnezhad; Farnad Nasirzadeh; Mostafa Khanzadi; Mohammad Jafar Jarban; Masoud Ghayoumian Purpose This research aims to model the social dimension of sustainability in construction projects. A new hybrid system dynamic (SD)–fuzzy Decision-Making Trial and Evaluation Laboratory (DEMATEL...
Journal Articles
Engineering, Construction and Architectural Management (2001) 8 (2): 114–129.
Published: 01 February 2001
... data selection and preprocessing, the modelling process and optimization of developed models. The paper also presents and discusses the results generated by the developed model. © MCB UP Limited 2001 Construction projects Fuzzy Fuzzy export systems Modelling Neurofuzzy Projects...
Journal Articles
Engineering, Construction and Architectural Management (1998) 5 (4): 359–375.
Published: 01 April 1998
..., as demonstrated in a case study, provides a method of solving borrowing decision problems. The model includes the ability to evaluate qualitative and fuzzy circumstances. The model also assists in the selection of sources of funding, taking into consideration the capital structure ratio, the period of cash...
