Update search
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
Filter
- All
- Title
- Author
- Author Affiliations
- Full Text
- Abstract
- Keyword
- DOI
- ISBN
- EISBN
- ISSN
- EISSN
- Issue
- Volume
- References
NARROW
Format
Journal
Type
Date
Availability
1-3 of 3
Keywords: Labour productivity
Close
Follow your search
Access your saved searches in your account
Would you like to receive an alert when new items match your search?
Sort by
Journal Articles
Engineering, Construction and Architectural Management (2025) 32 (13): 148–173.
Published: 09 May 2025
... precast concrete company and analysed using a system dynamics (SD) modelling approach. The labour productivity and profitability were simulated for different sensitivity scenarios across five (5) main PMP activities: reinforcement, formwork, concreting, finishing, and crane operation. Findings...
Journal Articles
ANN-based prediction intervals to forecast labour productivity
Available to PurchaseFarnad Nasirzadeh, H.M. Dipu Kabir, Mahmood Akbari, Abbas Khosravi, Saeid Nahavandi, David G. Carmichael
Engineering, Construction and Architectural Management (2020) 27 (9): 2335–2351.
Published: 29 May 2020
...Farnad Nasirzadeh; H.M. Dipu Kabir; Mahmood Akbari; Abbas Khosravi; Saeid Nahavandi; David G. Carmichael Purpose This study aims to propose the adoption of artificial neural network (ANN)-based prediction intervals (PIs) to give more reliable prediction of labour productivity using historical data...
Journal Articles
Beamless or beam-supported building floors: Is buildability knowledge the missing link to improving productivity?
Available to Purchase
Engineering, Construction and Architectural Management (2017) 24 (3): 537–552.
Published: 15 May 2017
...Abdulaziz M. Jarkas Purpose Due to a dearth of quantitative research into buildability factors affecting formwork labour productivity of in situ reinforced concrete construction, the purpose of this paper is to establish a distinct point of departure from the prevalent qualitative trend...
